As a part of updating the services at Flemington race track, The Victorian Racing Club Limited,(VRC), engaged the services of All Trenching and Boring Services to replace the mains water pipe at the track. This involved boring underneath the hallowed turf that is Flemington Race Track, for a distance of 120m, then pulling through a new 180mm water pipe, ready for connection.
PROJECT DESCRIPTION
PROJECT DETAILS
Categories: | |
Client: | Victorian Racing Club Limited. (VRC) |
CONTACT
PO Box 148, Mulgrave Vic 3170
1300 953 282
0411 501 366 Tim
info@atbsolutions.net.au
(03) 8555 0267
Mon – Sat: 9:00 – 18:00